Cabling

Cable plan workspace > Cabling toolbar

Cabling toolbar

Restrictions:
Cable plans cannot be created for:

-> Requirements:

A completed PV system must be present in order to create a cable plan. That means that the PV modules must be connected to an inverter.

 

Cable automatically

You should first define the cable nodes, upon which everything should be connected.

 

Use this button to automatically create a cable plan. -> See "Automatic cabling'.
 

Open the Cable options

 

Start the drawing mode for Module connection cable

in editor:

Manuel cabling

 

Caution: cabling of this inverter is only considered to be complete if all strings of an inverter are connected with a cable grommet. Cable losses in PV*SOL can only be calculated for complete cabling (Calculation > Technical data > Losses).