Cable plan workspace > Cabling toolbar
Cabling toolbar
Restrictions:
Cable plans cannot be created for:
mounted systems and
MPP trackers that extend over several mounting surfaces.
-> Requirements:
A completed PV system must be present in order to create a cable plan. That means that the PV modules must be connected to an inverter.
|
You should first define the cable nodes, upon which everything should be connected. |
|
Use this button to automatically create a cable plan. -> See "Automatic cabling'. |
|
Open the Cable options
|
|
Start the drawing mode for Module connection cable |
in editor: |
Caution: cabling of this inverter is only considered to be complete if all strings of an inverter are connected with a cable grommet. Cable losses in PV*SOL can only be calculated for complete cabling (Calculation > Technical data > Losses).